Object number
|
151,03
|
151.04
|
151.05
|
151.06
|
|
Yard numbers
|
388
|
389
|
393
|
394
|
|
Start of construction
|
22.03.1989
|
01.06.1989
|
20.02.1990
|
23.04.1990
|
|
Kill laying
|
20.06.1989
|
13.09.1989
|
10.07.1990
|
21.08.1990
|
|
Launching
|
25.05.1990
|
07.07.1990
|
22.10.1990
|
01.11.1990
|
|
State of construction :
|
|
|
|
|
|
Hull and
superstructure :
|
Hull, superstructures, deckhouse
structure, mast and
service platforms, seating
and foundations are completed
and were
tested.
|
Hull, superstructures, dechouse structure, seatings
and foundations
are finished
and were
tested completly.
Mast and
service platforms
are abt.
80% ready
|
The hull
is finished.
Superstructues and
deckhose structure
is completed
at 70 %.
Except from
seatings and
foundations for
main engines,
Diesel generator sets,
reduction gears,
clutches and the
forward gun
mount no further
saetings and
foundations are
built in.
|
The hull, apart from the
fitting of
the longitudinal bulkheads is finished.
Foundations for
the propulsion
plant are
finished at
70 %, those of the
electrical plants
are completed
at 30 %.
The deckhouse
structure, mast and service
platforms are
not made.
|
|
Propulsion plant
|
3 x Main engines
type M520/3970 kW, reduction gears clutches,
shaftings and propellers
are completed.
Machinery plant central
control systems, propulsion
systems are
at 90 %.
|
The shaftings, shaft
bearings and
the propellers are installed
completly.
Propulsion support
systems are
installed partly
( at abt. 40 %).
The ship is
not fitted
with main
engines, reduction
gears and
clutches.
|
Except from the
shaft bearings
no plants
of the
propulsion system are
installed.
|
Installation work has not
started
|
|
Electrical plant
|
Diesel genarator
sets, main switchboards, switchboards, swith gears
and panels
are installed.
All cables
are layed.
Connections of
the cables
between the
electrical plants
and electrical users were
completed at
20 % to 40 %.
|
All cables
are layed.Dieselgenerator
sets, main switchboards,
switchgears and
panels are on
board to
a minor part.
|
Installation work has not
startsed.
|
Installation work
has not
started.
|
|
Command and
surveillance
|
The installation
works were
started, but finished
to a minor part
only.
|
The systems are
not installed on this ship.
|
Installation work has not
started.
|
Installation work has not
started.
|
|
Auxiliary systems
|
Pumps, piping systems, air ducts,
potable water
generation and
anchor handling equipment are
finished at 75 %.
Mooring/towing systems
and steering
system are finished.
|
The mooring system and
rails are completed.
The steering
system is
not installed.
Pumps, piping systems,
air ducts,
towing system,
anchor handling equipment
is finished
at abt. 50 %.
|
The mooring/towing system
is built in at abt. 50 %.
All other equipment is
not installed.
|
Installation work
has not
start except
from the
partly built
in mooring
and towing
systems.
|
|
Outfit and
accomodation
|
Hull designating &
marking, rails, deck covers,
Ladders, doors, windows, cathodic protection
devices and
appendages are
mounted completely.
Insulation on
the ship’s
hull is
almoust finished.
Refrigerated spaces, galley and
electronic control
centre are finished
at approx
75 %. The other
rooms are furnished
at a
minor part
only.
|
Hull designating&marking,
rails, deck covers, ladders, doors, windows, cathodic
protection devices
and appendages
are mounted
completly.
Insulation of the
ship’s hull is finished at
85 %.
Living, service and working
spaces are not
built in.
|
Appendages and
rails on
the hull
are mounted.
All other outfits
and accomodations
are not
installed.
|
Apart from
the rails
on the
main deck
no outfit and
accomodation exists
on board.
|
|
|
|
|
|
|